Steel fabrication brings material records, fit-up, welding and dimensional requirements together. Inspection checkpoints should follow the fabrication sequence, especially where later work makes a connection difficult to access.
Where the details matter.
Typical procurement focus areas for discussion. The exact equipment and activities must be confirmed in the assignment.
Structural members and fabricated frames
Weld-related records and visual observations
Material references and dimensional checks
The technical context.
AWS D1.1 sets requirements for structural steel welding, including qualification, fabrication and inspection. Its use must follow the specified material, application and contract; it is not automatically the correct code for every welded product.
Standards & expertiseReferences & technical context
Company information follows Sanka’s published scope. Technical references provide context, not a claim of certification. The applicable standard, edition and scope are agreed for each project.
Let’s define your scope.
A few project details are the best place to start.