BASED IN THE NETHERLANDS. CONNECTED ACROSS EUROPE.
READY FOR ACCEPTANCE

Final inspection

A final assessment brings together visual checks, dimensional verification and record review within the agreed scope, giving you a documented basis for acceptance decisions.

ANATOMY OF AN ASSIGNMENT

Final drawings and applicable specifications · Inspection history and open-item list · Test records and completion schedule

INSPECTION FOCUS

A closer look at the scope.

One final, detailed check before you accept the finished result.

Finished-product visual assessment

Specified dimensional verification

Review of available test records

Outstanding items and acceptance status

These are potential scope items, not a fixed package. Equipment, acceptance criteria, location and inspector availability are confirmed before an assignment.

BEFORE WE ARRIVE

A good inspection starts with good information.

  • Final drawings and applicable specifications
  • Inspection history and open-item list
  • Test records and completion schedule
WHAT YOU TAKE AWAY

A clear record. An informed next step.

A consolidated record of the agreed final checks and any items that still require a decision or action.

Final-check record
REPORT OUTLINE

From observation to a clear record.

Assignment & requirements

The equipment, location, agreed scope and reference documents establish the context.

Observations & supporting evidence

Observations are linked to the checks performed and the evidence available.

Exceptions & open items

Limitations, deviations and items requiring clarification remain visible.

Summary for project review

The record brings together the findings for the responsible project team.

Illustrative structure, not an issued inspection report. Content and deliverables are agreed per assignment.

A few details, clarified.

How does this differ from pre-shipment inspection?

Final inspection focuses on completion against acceptance criteria. Pre-shipment inspection is tied to the goods being dispatched. The scopes can overlap and should be agreed to avoid gaps or duplication.

How do I arrange an inspection?

Send the equipment description, supplier location, required dates and available technical documents. The team can then review scope and availability before confirming an assignment.

References & technical context

Company information follows Sanka’s published scope. Technical references provide context, not a claim of certification. The applicable standard, edition and scope are agreed for each project.

SANKA / NEXT STEP

Let’s define your scope.

A few project details are the best place to start.

Start an inspection enquiry