BASED IN THE NETHERLANDS. CONNECTED ACROSS EUROPE.
TECHNICAL CLARITY

Documentation review

We review drawings, material certificates, test records and quality documentation against the requirements you provide, and identify missing or inconsistent information.

ANATOMY OF AN ASSIGNMENT

Document register and available files · Required deliverables and submission dates · Review criteria and revision conventions

INSPECTION FOCUS

A closer look at the scope.

Turn technical paperwork into a clear picture of product conformity.

Drawings and specification revisions

Material certificates and test reports

Inspection and quality control plans

Databook completeness and consistency

These are potential scope items, not a fixed package. Equipment, acceptance criteria, location and inspector availability are confirmed before an assignment.

BEFORE WE ARRIVE

A good inspection starts with good information.

  • Document register and available files
  • Required deliverables and submission dates
  • Review criteria and revision conventions
WHAT YOU TAKE AWAY

A clear record. An informed next step.

An organised review record highlighting missing documents, revision mismatches and items needing clarification.

Document review record
REPORT OUTLINE

From observation to a clear record.

Assignment & requirements

The equipment, location, agreed scope and reference documents establish the context.

Observations & supporting evidence

Observations are linked to the checks performed and the evidence available.

Exceptions & open items

Limitations, deviations and items requiring clarification remain visible.

Summary for project review

The record brings together the findings for the responsible project team.

Illustrative structure, not an issued inspection report. Content and deliverables are agreed per assignment.

A few details, clarified.

Does a document review confirm physical product condition?

Not on its own. Document review assesses supplied evidence. Physical condition and dimensions require a separately defined on-site inspection scope.

How do I arrange an inspection?

Send the equipment description, supplier location, required dates and available technical documents. The team can then review scope and availability before confirming an assignment.

References & technical context

Company information follows Sanka’s published scope. Technical references provide context, not a claim of certification. The applicable standard, edition and scope are agreed for each project.

SANKA / NEXT STEP

Let’s define your scope.

A few project details are the best place to start.

Start an inspection enquiry