BASED IN THE NETHERLANDS. CONNECTED ACROSS EUROPE.
REQUIREMENTS CHECKED

Compliance verification

We check the agreed technical evidence against applicable codes and contractual requirements. The relevant standards and extent of verification are confirmed for each assignment.

ANATOMY OF AN ASSIGNMENT

Product type and intended application · Contractual codes and applicable editions · Technical documentation and conformity records

INSPECTION FOCUS

A closer look at the scope.

Connect your project requirements with the applicable technical standards.

Applicable specification identification

Evidence against agreed requirements

Certificate and record consistency

Gaps requiring responsible-party review

These are potential scope items, not a fixed package. Equipment, acceptance criteria, location and inspector availability are confirmed before an assignment.

BEFORE WE ARRIVE

A good inspection starts with good information.

  • Product type and intended application
  • Contractual codes and applicable editions
  • Technical documentation and conformity records
WHAT YOU TAKE AWAY

A clear record. An informed next step.

A technical review of the evidence in the agreed scope. This is not a blanket certification, CE approval or notified-body service.

Evidence review
REPORT OUTLINE

From observation to a clear record.

Assignment & requirements

The equipment, location, agreed scope and reference documents establish the context.

Observations & supporting evidence

Observations are linked to the checks performed and the evidence available.

Exceptions & open items

Limitations, deviations and items requiring clarification remain visible.

Summary for project review

The record brings together the findings for the responsible project team.

Illustrative structure, not an issued inspection report. Content and deliverables are agreed per assignment.

A few details, clarified.

Does this replace a notified body where one is required?

No. Regulatory conformity assessment may require a specifically authorised body. Independent inspection supports your project but does not replace those required roles.

How do I arrange an inspection?

Send the equipment description, supplier location, required dates and available technical documents. The team can then review scope and availability before confirming an assignment.

References & technical context

Company information follows Sanka’s published scope. Technical references provide context, not a claim of certification. The applicable standard, edition and scope are agreed for each project.

SANKA / NEXT STEP

Let’s define your scope.

A few project details are the best place to start.

Start an inspection enquiry