BASED IN THE NETHERLANDS. CONNECTED ACROSS EUROPE.
SUPPLIER OVERSIGHT

Vendor surveillance

We monitor agreed production activities and quality checkpoints at the vendor’s premises, so your project team can make informed decisions without being on site.

ANATOMY OF AN ASSIGNMENT

Vendor location and production scope · Quality plan and relevant procedures · Visit frequency and reporting expectations

INSPECTION FOCUS

A closer look at the scope.

A clear, independent view of quality at your supplier’s facility.

Agreed production activities

Quality control implementation

Milestone and inspection readiness

Follow-up of recorded observations

These are potential scope items, not a fixed package. Equipment, acceptance criteria, location and inspector availability are confirmed before an assignment.

BEFORE WE ARRIVE

A good inspection starts with good information.

  • Vendor location and production scope
  • Quality plan and relevant procedures
  • Visit frequency and reporting expectations
WHAT YOU TAKE AWAY

A clear record. An informed next step.

An independent account of the activities observed during agreed visits, not an assumption of continuous factory supervision.

Visit observations
REPORT OUTLINE

From observation to a clear record.

Assignment & requirements

The equipment, location, agreed scope and reference documents establish the context.

Observations & supporting evidence

Observations are linked to the checks performed and the evidence available.

Exceptions & open items

Limitations, deviations and items requiring clarification remain visible.

Summary for project review

The record brings together the findings for the responsible project team.

Illustrative structure, not an issued inspection report. Content and deliverables are agreed per assignment.

A few details, clarified.

Can surveillance be arranged for several visits?

The proposed visit frequency can follow the manufacturing plan. Coverage, attendance and reporting are agreed individually rather than assumed to be continuous.

How do I arrange an inspection?

Send the equipment description, supplier location, required dates and available technical documents. The team can then review scope and availability before confirming an assignment.

References & technical context

Company information follows Sanka’s published scope. Technical references provide context, not a claim of certification. The applicable standard, edition and scope are agreed for each project.

SANKA / NEXT STEP

Let’s define your scope.

A few project details are the best place to start.

Start an inspection enquiry